National Repository of Grey Literature 66 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Storage area with administrative building
Šesták, Tomáš ; Dohnal, Jakub (referee) ; Pěnčík, Jan (advisor)
This master thesis focused on the design and elaboration of project documentation for the purpose of a storage area with an administrative building, consisting of the premises SO 01 - storage hall and SO 02 - administrative building. Objects are located on parcels no. 4006/16, 4006/17, 4006/18, 4006/19, 4006/23, 4006/24, 4006/26, 4006/27, 4006/28, 4006/29, 4006/30, 4006/31, 4006/32, in the cadastre unit Dolní Bojanovice. They are located on an investor's land. Traffic connection is provided by the exit from the car park on the local road. All engineering infrastructure engineering networks are located near the site. The design of the building respects the local zoning plan. Project documentation is prepared in accordance with the current wording of applicable laws, decrees and standards. The project solves the structure functionally divided into objects SO 01 and SO 02, which are both operationally and structurally connected. The construction of objects is statically independent. The object SO 01 is designed for the storage of building material intended for storage in dry rooms. In addition to the storage space there is the air-conditioning machine room. The SO 02 facility serves administrative and staffing facilities. In the basement of the building there are rooms of technical background and archives. The SO 01 is designed as a full-metal mounted object with a counter roof and foundation pads. The design system of the SO 01 object is columnar with steel columns. The SO 02 building is designed from a wall construction system made of aerated concrete blocks with reinforced concrete ceilings, base strips and a flat roof. The SO 01 has a 65.5x20.2 m ground plan. The perimeter shell of the building consists of assembled sandwich panels with a core of pure material. The largest ground plan dimensions of the so 02 are 26.75x10.35 m. The perimeter shell is made up of 375 mm piece concrete blocks with a 150 mm contact system.
Medical center Hlinsko
Pilný, Ondřej ; Burianová, Lenka (referee) ; Kacálek, Petr (advisor)
This diploma thesis deals with the design and elaboration process of a project documentation of medical center in city Hlinsko. New building is situated in the northern part of the city in the area determined for constructions of public infrastructure. It´s a four-floor object with partial basement and slant mansard and flat vegetative roof.Object is based on foundation strips and footings made from reinforced concrete.The bearing and internal walls are designed from KALKSANDSTEIN lime sand blocks.The beams and collums are used in the placed designed with open disposition.The ceiling in 1.PP is designed as reinforced concrete for securing fire safety.The rest od ceiling constructions is designed from prestressed concrete panels SPIROLL,with exception in 4.NP,where the ceiling constructions are made from solid roof system YTONG KOMFORT,which is layed on frame system made of steel and reinforced concrete.The peripheral walls of 1.PP are made from lost formwork, which is insulated with extruded polystyrene.The walls in floors above ground are insulated with combination of external thermal insulation system (ETICS) and ventilated facade with CEMBRIT SOLID and PATINA facade cladding panels. The building is functionally divided into several part.Cafe, pharmacy, ambulance and medical center, each with it´s own entrance.Pharmacy is equipped with shop, medicine mixer and storage.Ambulance is equipped with garage slots, background for employees, room of crisis preparedness and operating center.Medical centrum is equipped with emergency, RTG, operating theater, rehabilitations and other types of examination rooms.Each examination room is equipped with waiting room.For more comfort the center has a background for employees.The whole object is designed with forced air exchange. Designed object is barrier-free.In front of the building is situated parking slots for cars, motorbikes and ambulances.Total number of slots is 74 places, which 5 is designed for disabled people.
Industrial Park with Aministration Building
Krupa, Jakub ; Dohnal, Jakub (referee) ; Pěnčík, Jan (advisor)
This master thesis focuses on the design and elaboration of project documentation for the purpose of constructing Industrial park with administration building consisting of two parts, SO 01 – Administration building and SO 02 – Industrial building. The two objects are situated on the plot No. 715/1, in the cadastre unit Vrbno pod Pradědem located on an undeveloped land of the investor. The exit from the parking lot connects to the local traffic infrastructure. Public infrastructure leads in proximity to the land. The design of the construction respects local zoning plan. Project documentation was made in compliance with up-to-date requirements according to valid standards and regulations. The building is functionally divided into two objects, SO 01 and SO 02, which are operationally and structurally connected. Constructions of both objects are statically independent. The object SO 01, partially accessible to the public, is used for administrative tasks and staff facilities. Also, there is a sample room available to the public, gatehouse and warehouses. The object SO 02 is purposed for the production of plastic windows and solar panels. It mainly consists of areas used for production, but there is also an office for the master, a machine room for heating, ventilating and air conditioning (HVAC) and staff facilities. The object SO 01 is designed from a wall structural system from clay masonry, clay ceilings, strip foundation and a flat roof. The object SO 02 is designed as a full-metal prefabricated object with a saddle roof and foundation pads. The construction system of this object consists of steel columns. Plan dimensions of SO 01 are 25x14 metres. Building envelope is made from clay blocks, 440 mm in width, filled with mineral wool. Plan dimensions of SO 02 are 66,9x22,9 metres. Object’s curtain walling is made from prefabricated sandwich panels containing a core from PUR material.
Jail Hrotovice
Vítámvásová, Lenka ; Jendryščíková, Kateřina (referee) ; Petříček, Tomáš (advisor)
This thesis called THE HROTOVICE JAIL consists of the project documentation of the cell block 1 and the kitchen building. The block 1 has got three floors and the kitchen building has got one floor. Both structures have got the flat roof. The block 1 consists of two-way skeletal system of ferroconcrete and it is walled by the POROTHERM system. The kitchen building also consists of the POROTHERM system. Both buildings are insulated by insulation system with EPS.
Sports Centre
Janča, Jan ; Havířová, Zdeňka (referee) ; Lavický, Miloš (advisor)
This Diploma thesis „Sports centre“ was made as a documentation for a building construction. The object of the sports centre is designed for 337 people and consists of two above-ground floors sports hall itself and joined one above-ground floor restaurant. It is detached building. Building is designed in slightly sloping terrain. The sports centre is located on the outskirts of city named Odry, within walking distance of residential buildings. The sports hall is divided into sections for athletes and referees, part for employees and parts for the public. The restaurant has own entrance from the western side of the building and is functionally connected to sports hall. The restaurant is further divided into units for the public and for the staff. The construction system of the sports hall is made of a prefabricated skeletal system based on baseplaces and a filling wall on the strip foundations, the restaurant is only bricked and based on the base on the strip foundations.
Residential house Hliniště, construction-technological solution of rough substructure
Divácký, Petr ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis is focused on the construction and technological solution of the rough substructure of the Hliniště apartment building in Velké Meziříčí. The house is composed of two separate building structures, built next to each other and set in the south sloping terrain. The construction is based on foundation feet and passports that carry the load from a top structure made of a prefabricated skeleton filled with ceramic masonry. The last 5th floor is realized as a residential attic, covered with a wooden roof with a saddle roof and sheet metal, profiled cover. The main chapters of this work are the technological regulations for the execution of earthworks and foundation structures, which are also processed by control and testing plans. In addition, the machine assemblies are designed for these activities, their schematic travel along the construction site, the excavation drawing, the building site layout, the budget item, the timetable and other attachments.
Rebuilding of family house at vacant lot
Nevrlý, Jaroslav ; Hubáček,, Petr (referee) ; Hubáčková, Blažena (advisor)
Project documentation addresses the single-family house. It is a terraced houses.The building has three floors. House is a no basement with flat roof and shed roof. The structural system consists of a vertical brick wall of ceramic bricks and reinforced concrete columns. Ceilings, beams and ceramic inserts. The roof is asingle casing. The construction is based on strip foundations and footings.
Newly-built of hotel
Smolíková, Zuzana ; Nováková, Eva (referee) ; Kolář, Radim (advisor)
The subject of the Diploma thesis was to design and prepare a documentation for the construction of a spa hotel. The building is situated in the village of Lipno nad Vltavou. This area is famous for a ski resort and the Lipno Dam which can be seen from the hotel. The hotel consists of three operating parts - spa, restaurant, accommodation and recreation area. The whole complex is designed as two rectangular plans. The spa part is a one-storey building with a flat green roof. The hotel with restaurant is a three-storey building with a pitched roof and metal roofing. The main entrance is oriented to the north. In front of the building there is a parking space for hotel guests. The spa structural system is a mix of a reinforced concrete frame with beam and a wall system made of clay blocks Porotherm. The hotel and restaurant is a wall structural system made of clay blocks Porotherm. The floor structure is designed as reinforced concrete slabs. The whole building is insulated to meet all the requirements of energy consumption of buildings.
Production hall MONTGAS - realization of the gross substructure
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the gross substructure of the new production hall of the company MONTGAS a.s. in Hodonín on the street U Kyjovky. Part of this technological phase is the realization of earthworks, driven gravel FRANKI piles, driven reinforced concrete FRANKI piles, cast-in-place reinforced concrete foundation pads, sills and strip foundations, soil slab, base layers and reinforced concrete floors of the building including steel fibre reinforced concrete slab and cast-in-place reinforced concrete structure of the paint shop inside the production hall. It also includes damp proof layer and insulation of foundation structures. The content of this work is the technology of earthworks and all piles in the form of technological regulation. Construction costs are calculated in an itemized budget from student version of the BUILDpowerS software with a bill of quantities. The schedule is drawn up in the form of a schedule from student version of the CONTEC software. Plans are in place to ensure both quality and safety during construction.
Low energy building
Tománek, Ladislav ; Kalánek, Jiří (referee) ; Brzoň, Roman (advisor)
The subject of the diploma thesis is the design documentation for the construction of low-energy building. This is a hotel komplex, which is located in the city of Brno-Bohunice. The hotel has four floors, no basement and a warm flat roof. On the ground floor there is a hotel restaurant with facilities for employees, main hall, social facilities, wellness and technical facilities. The part of first floor consists of conference halls and a gym. In other parts of hotel are designed 47 guest rooms. Two guest rooms are for people with reduced mobility. The accommodation capacity of the hotel is 82 people. There are uncovered parking spaces for cars and one bus, tennis courts and a hotel garden on the plot. The structural system is combined with reinforced concrete columns and brick blocks. Horizontal structures are designed as cast-in-place reinforced concrete floor. The construction is based on foundation pad and strip foundation. The external wall is built from hollow clay blocks and insulated with external thermal insulation composite systém. The diploma thesis is processed to the extent of design documentation for construction.

National Repository of Grey Literature : 66 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.